Part of the Duratite Group of Companies
01208 832 602Read customer reviewsUK-wide enquiries
ServicesWarehouse & IndustrialAsbestos EncapsulationExternal Foam RoofingConcrete SoffitsAgriculturalAnti-CondensationCorrugated RoofFlat RoofPitched RoofLeisure & PoolsAll services →
Case StudiesUniversity Hospital of WalesLNER Stadium, YorkDepot Events, CardiffTrago Mills, CornwallIbstock Brick, WalsallAll case studies →
ProductsNexseal LE — closed-cellSucraseal — open-cell
KnowledgeSpray Foam Cost GuideFoam vs TraditionalStopping CondensationAsbestos EncapsulationAll guides →
LocationsFAQs01208 832 602Book a Free Survey →
Duratite Group project

Pondswick Substation: Concrete Soffit Insulation, Luton

A 127 m² concrete soffit insulated with an average 90 mm of Nexseal LE and finished with DC315 in Ice Grey at Pondswick Primary Substation, Luton.

Discuss a similar project →

Project at a glance

Project
Pondswick Primary Substation
Location
Luton, Bedfordshire
Project parties
Vulcan Passive Fire / UK Power Networks
Installer
Spray Foam Tech — Duratite-approved contractor
Application
Undercroft concrete soffit
Treated area
127 m²
Insulation
Enverge Nexseal LE
Applied thickness
90 mm average
Protective finish
DC315 intumescent coating, Ice Grey
Installation period
October 2025

The building and the original brief

The newly constructed substation had a raised concrete floor slab supported by a steel frame. The undercroft provided space for cabling, drainage and ventilation, leaving the underside of the slab exposed. The insulation brief concerned this concrete soffit beneath the internal switchgear area.

Duratite was engaged by Vulcan Passive Fire, appointed by UK Power Networks, for the soffit insulation works. The published project account identifies thermal loss, moisture conditions and fire requirements as important design considerations for the building. The chosen solution therefore included both the insulation and a specified protective coating.

The specified system

Bonded insulation layer

Enverge Nexseal LE closed-cell spray foam was specified for direct application to the concrete underside. The recorded average thickness was 90 mm across 127 m² of soffit.

Protective coating

After the foam had cured, DC315 intumescent coating was spray-applied in an Ice Grey finish. It was a separate operation completing the specified exposed-surface finish.

A complete specification

The project record describes the Nexseal LE and DC315 combination as its selected fire-rated system. Fire performance belongs to the tested build-up and project documentation; a product name alone does not transfer that classification to another soffit.

How the work was carried out

  1. Establish the application area

    The undercroft was the work location, with the concrete slab underside forming the insulation substrate. The existing building arrangement included steel framing and space for services beneath the floor.

  2. Apply the soffit insulation

    Spray Foam Tech installed Nexseal LE directly to the concrete. The recorded installation took place in October 2025, with an average applied thickness of 90 mm over the stated area.

  3. Complete the coating stage

    Once the foam was cured, the installer applied the DC315 finish. The project photographs distinguish the foam application stage from the subsequent coated surface.

  4. Record the installed build-up

    The published record identifies the treated area, insulation thickness, product combination and colour finish. These details make the example useful to a designer comparing exposed-soffit approaches.

Project photography

Before: the concrete undercroft soffit and access conditions.
Before: the concrete undercroft soffit and access conditions.
Application: Nexseal LE installed to the concrete underside.
Application: Nexseal LE installed to the concrete underside.
Completed: the insulated soffit with its protective coating.
Completed: the insulated soffit with its protective coating.

The documented result

The finished photographs show the underside of the slab covered by the insulation and Ice Grey coating. The installation completed the specified foam-and-coating build-up for the substation undercroft, providing a defined treatment to a previously exposed concrete surface.

This is a useful example of why a soffit project needs more than a foam depth on a quotation. The exposed finish, substrate, services and intended use need to be considered together. The record supplies an actual installed system and area; it does not supply independent before-and-after energy measurements.

Planning a similar project

For a similar undercroft or car-park slab, provide drawings, the thermal brief, headroom, substrate condition and service-access requirements. Include the project’s fire requirements so that the complete insulation and protective finish can be assessed.

Explore our relevant insulation and roofing service or use the quotation checklist to prepare your brief.

Project details and photography adapted from Duratite’s original Pondswick project record. ThermoFoam is part of the Duratite Group.

Free survey

Get a quote for your project

Send us your building details and our technical team will specify the right system and a clear budget. No obligation.

01208 832 602Mon–Fri, 8am–5pm
info@thermofoam.co.ukWe reply within one working day
Warranty by specificationDocumented, surveyor-ready installs
Book your free surveyNo obligation · we reply within one working day
Got a project? Free no-obligation survey & quote.
01208 832 602Free Survey →