Part of the Duratite Group of Companies
01208 832 602★★★★★ Rated Excellent on TrustpilotISO 9001 · UK-Wide
ServicesWarehouse & IndustrialAsbestos EncapsulationExternal Foam RoofingConcrete SoffitsAgriculturalAnti-CondensationCorrugated RoofFlat RoofPitched RoofLeisure & PoolsAll services →
Case StudiesUniversity Hospital of WalesLNER Stadium, YorkDepot Events, CardiffTrago Mills, CornwallIbstock Brick, WalsallAll case studies →
ProductsNexseal LE — closed-cellSucraseal — open-cell
KnowledgeSpray Foam Cost GuideFoam vs TraditionalStopping CondensationAsbestos EncapsulationAll guides →
LocationsFAQs01208 832 602Book a Free Survey →
Duratite Group project

SAICA, Warrenpoint — External Roof Encapsulation

Unit 3 at SAICA Pack UK’s Warrenpoint site: 1,090 m² of external roof encapsulation, delivered around an operating packaging plant with a closed-cell roofing foam and GacoFlex U91/U92 system.

Discuss a similar project →

Project at a glance

Client
SAICA Pack UK Limited
Location
Warrenpoint, County Down
Building covered here
Unit 3
Principal contractor
Duratite Projects Limited
Roof area
1,090 m²
Substrate
Asbestos-cement roof sheets
Roofing foam
Closed-cell polyurethane roofing foam
Recorded thickness
30–35 mm target
Base coat
GacoFlex U91
Top coat
GacoFlex U92 aliphatic coating
Site constraint
Operating plant and vehicle movements

The building and the original brief

Unit 3 combined a weathered asbestos-cement roof with demanding access conditions. The source record describes moss and lichen in the roof corrugations, open-sided sections, vehicle movement beneath the works and approximately 110 linear metres of exposed perimeter.

The sheets were assessed as structurally sound for the selected approach. Unit 3 was used to establish the access arrangements and system delivery before the wider roofing programme progressed. The 1,090 m² figure on this page is the Unit 3 area, not the total area of the SAICA programme.

The specified system

Substrate preparation

Biological growth was removed and the roof received biocidal treatment. The cleaned substrate was signed off before foam application.

Roofing foam

The recorded specification used closed-cell polyurethane roofing foam at a 30–35 mm target thickness across the corrugated sheets.

Urethane base coat

GacoFlex U91 was applied over the cured foam. The coating stage followed the foam operation as work progressed across the roof.

Exterior top coat

GacoFlex U92 provided the specified aliphatic top coat. Gutters were coated through so the treatment continued towards the outlets rather than simply bridging over the drainage details.

How the work was carried out

  1. Install the access and protection

    The published record identifies internal safety netting, perimeter protection and a proprietary fragile-roof walkway system. Access installation took around seven working days; this was a significant part of the programme.

  2. Manage the exposed site

    The perimeter was netted and sheeted to contain the work. The team monitored roof-level wind and checked substrate temperature against dew point ahead of application.

  3. Confirm adhesion and depth

    A trial area was used to demonstrate adhesion before the main application. Foam depth was probed against the recorded target as the work progressed.

  4. Check the coating application

    Wet-film readings were taken for the coating stages. These checks, together with the gutter treatment, formed part of delivering the specified foam-and-coating system.

Project photography

Aerial view of completed roof works at SAICA Warrenpoint; the Unit 3 specification is described in this case study.
Aerial view of completed roof works at SAICA Warrenpoint; the Unit 3 specification is described in this case study.

The documented result

Duratite reports that the Unit 3 roof was completed with the sheets retained in place and the plant continuing production. The project established the approach on the site’s most constrained building before the programme moved on to the remaining roof areas.

The source records a 20-year manufacturer-backed product warranty for the Gaco U9 coating system, subject to the manufacturer’s technical sign-off. That is a system-specific product term, not an unconditional warranty for every part of a building. The principal value of the case is the documented access planning, application checks and continuity of the finished treatment.

Planning a similar project

For a roof over live operations, the practical brief needs to include vehicle routes, open sides, exposed edges, fragile-roof access and drainage. These constraints influence the programme as much as the roof area.

Explore our relevant insulation and roofing service or use the quotation checklist to prepare your brief.

Project details and photography adapted from Duratite’s original SAICA project record. ThermoFoam is part of the Duratite Group.

Free survey

Get a quote for your project

Send us your building details and our technical team will specify the right system and a clear budget. No obligation.

01208 832 602Mon–Fri, 8am–5pm
info@thermofoam.co.ukWe reply within one working day
Warranty by specificationDocumented, surveyor-ready installs
Book your free surveyNo obligation · we reply within one working day
Got a project? Free no-obligation survey & quote.
01208 832 602Free Survey →